How to Check and Inspect the Frame Scaffolding Before Using

time2020/01/07

Frame scaffolding, the last step acceptance is very important, is one of the most important in the construction projects, after acceptance of fully qualified rear can use.
Height under the 20 m and 20 m scaffolding, project organization, head of the technology by the unit security personnel inspect acceptance; Height is more than 20 m scaffold by engineering technology with the progress of the organizational unit in stages, head of the project director and relevant acceptance technology security personnel to check.

1, the acceptance should have the following documents:
The necessary construction design documents and assembly diagram; pre galvanized door frame scaffolding parts factory certification or quality grading qualified; Record and quality inspection of the scaffold construction; Major issues of the scaffold erection and processing records; The construction of the scaffold inspection report.
 
2, scaffolding engineering acceptance, in addition to examine relevant documents, should also be on-site audit. Selective examination should focus on the following, and construction acceptance report: Whether secured, whether complete, the fastener tighten, qualified; Safety net hanging and armrest Settings are complete; Whether level off solid; Even the wall bar set ever missed, if they are complete and conform to the requirements; Verticality and levelness is qualified.
 
3, the levelness of the scaffold:
Bottom step scaffolding deviation should be along the wall of the longitudinal level L / 600 or less (L is the length of the scaffold.