Follow us :

  • We are honored to offer you limited free samples.

  • Professional Factory.

  • Professional Factory.

  • Yes. All related scaffolding materials. (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system) (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500 (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728) (4) steel coupler (preesed / drop forged coupler) (5) steel plank with ho...

  • Yes. All related scaffolding materials. (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system) (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500 (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728) (4) steel coupler (preesed / drop forged coupler) (5) steel plank with ho...

  • Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

  • We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

  • Our company's products can be produced according to customer requirements. Can be sprayed, painted, hot-dip galvanized, electro-galvanized, etc.

  • First, the basic conditionsSurface roughness as Class C, the basic wind pressure Wo = 0.45KN / , Li net mesh size of 3.5cm × 3.5cm, rope diameter 3.2mm, weight 0.01KN / .Second, the erection height calculationChecking the site should generate bending stress analysis to determine the size, so first calculate wind loads generated pressure should be based on wind loads for δwδw computingLegislative...

  • Modern construction, the template, scaffolding played an important role, the quality of templates, scaffolding products directly related to the quality of the project and construction safety. Templates, scaffolding leasing industry (hereinafter referred to as "mold leasing industry") is an important part o...

  • The year before last year, Beijing West West 4 plots due to the collapse of the template led to 8 people died; last April, Dalian and the collapse of the template caused six people were killed. Mold support the accident has become a difficult problem, and aroused national attention. Mold accident is not ju...

  • 1. Who are we?Zhonghong scaffolding company refers to scaffolding & formwork design, manufacturing, rental & contract.2. When was Zhonghong Scaffolding founded?20043. Where is Zhonghong Scaffolding located?Zhonghong Scaffolding is located in Tianjin, which has great location where just 30 minutes away from beijing by train and one hour by car, also 60km from Tianjin Port.The address is Nanwangpin...

  • Why is the disk buckle scaffold so highly praised by users? Why are bamboo, wooden scaffolding and single-row fastener-type steel scaffolds constantly being banned from use? I believe we all know that many safety accidents are not just problems with construction schemes, problems with non-standard scaffolding structures, etc. It is the quality of many scaffolds, but the quality of these three type...

  • The construction of the city is inseparable from the construction of the building. However, according to the data released by the Ministry of Housing and Urban-Rural Development, the number of high-altitude falls accidents exceeds 50%. Because of the open air and high-rise operations, the production flow is large, the degree of mechanization is low, and the processes are complex. Affected by natur...

  • Strengthen the safety management of scaffolding,Tiandi Scaffolding reminds scaffold steel pipe must be set up in accordance with the requirements of the program, a three-step inspection, after passing the acceptance and hanging qualified license can be used after the removal of scaffolding should be set warning line, prohibiting the entry of unrelated personnel, the order of removal should be from...

  • Fasteners are intermediate connecting parts for connecting rails and sleepers. Its function is to fix the rail on the sleeper, maintain the gauge and prevent the rail from moving longitudinally and laterally relative to the sleeper. In the concrete sleeper track, due to the poor elasticity of the concrete sleepers, the fasteners must also provide sufficient elasticity. For this reason, the fastene...

  • At present, in the domestic construction, more standard construction units have basically eliminated the problem of over-construction of over 2 levels of gate scaffolding. Instead, steel pipes and fasteners are used to build mobile platforms. However, it is urgent to solve the problems of heavy, unsafe, and inefficient. If such products cause accidents, they will not only have a huge impact on the...