Brief description of acceptance criteria for scaffold sweeping rods

The construction of the city is inseparable from the construction of the building. However, according to the data released by the Ministry of Housing and Urban-Rural Development, the number of high-altitude falls accidents exceeds 50%. Because of the open air and high-rise operations, the production flow is large, the degree of mechanization is low, and the processes are complex. Affected by natural climate and human factors, it has become a frequent occurrence area for security accidents.


Scaffolding is an important facility for civil engineering construction. It is a work platform or work channel that is set up to ensure the safety of high places and smooth construction. In the construction of structures, decoration construction and installation of equipment pipelines, scaffolding needs to be erected in accordance with operational requirements.

Let's take a look at the acceptance of the scaffold sweeping bar.


(1) The sweeping rod must be connected with the vertical rod and must not be connected between the sweeping rod and the sweeping rod;


(2) The level difference of the sweeping pole shall not be greater than 1m, and the distance from the slope shall not be less than 0.5m;


(3) Longitudinal sweeping rods shall be fastened with vertical angle fasteners on upright poles not more than 200mm away from the base of the base;


(4) The horizontal sweeping pole should be fixed on the vertical pole under the longitudinal sweeping pole by using right angle fasteners.


The above is all the contents of Xiao Bian. I hope that everyone will carefully inspect and verify the personal safety of everyone in the inspection of scaffolding sweeping rods.